PROFIT DAY manufacturing facility in China
Since 1995 · Hong Kong Headquarters

Engineered FRP Solutions for Industrial Applications

Manufactured in China. Serving Japanese industrial customers with over 30 years of FRP expertise.

PROFIT DAY is headquartered in Hong Kong with manufacturing in China. We produce cooling tower parts, FRP sanitary equipment, grease traps, steel fabrication, and water treatment equipment — primarily for Japanese industrial customers, with engineering support available for international quote requests.

30+Years

Manufacturing Experience

OEM

Custom manufacturing

Japan

Primary market

OEM

Build-to-order supply

01 / 09Products

A catalog of PROFIT DAY manufactured products.

FRP and steel products manufactured in our China facilities to customer drawings. Lamination, gel coat application, steel fabrication, assembly, and inspection under one integrated workflow.

6 product families Build-to-order Engineering support available

Custom ManufacturingEngineer-to-order

Need Custom FRP Parts?

Send a drawing. Our engineering team reviews every submission and responds as soon as possible with materials, tooling, pricing, and timeline.

  1. 01Send Drawing

    PDF, STEP, DWG, or IGES — our engineering team reviews every submission.

  2. 02Receive Proposal

    Material spec, tooling cost, unit price, and lead time.

  3. 03Review & RFQ Support

    After review, our Hong Kong and mainland China teams provide standard RFQ guidance.

02 / 09Why FRP

Why FRP is used in our product lines.

FRP offers corrosion resistance and light weight in the wet, outdoor, and sanitary environments where PROFIT DAY products are installed.

Customer drawings accepted

01

Corrosion Resistant

Suitable for wet and outdoor environments where moisture and exposure are ongoing concerns.

02

Lightweight

Easier to handle, transport, and install compared with heavier structural materials.

03

Design Flexibility

Components can be built to customer drawings for project-specific layouts and interfaces.

04

Low Maintenance

Reduces the need for recurring protective coatings in many service environments.

Application Environments

Wet, outdoor, and sanitary equipment environments

Manufacturing Method

Made to customer drawings

Supply Formats

FRP parts, steel parts, and assembled components

Project Support

Drawing review, samples, and quotation support

04 / 09Manufacturing Capabilities

Integrated FRP Manufacturing Process.

From incoming inspection and gel coat application to lamination, demolding, grinding and deburring, final inspection, and shipment, key processes are managed through one integrated workflow.

01

Main Manufacturing Process

01Step

Incoming Inspection

02Step

Lamination Resin Mixing & Weighing

03Step

Glass Fiber Cutting

04Step

Gel Coat Mixing, Agitation & Filtration

05Step

Gel Coat Application

06Step

In-Process Inspection & Acceptance Decision

07Step

Lamination

08Step

Demolding

09Step

Grinding & Deburring

10Step

Assembly (When Required)

02

Process & Mold Control

11Step

In-Process Inspection

12Step

Daily Mold Inspection

13Step

Mold Repair

03

Final Quality & Shipping

14Step

Final Product Inspection

15Step

Warehousing

16Step

Pre-Shipment Inspection

17Step

Loading Confirmation

18Step

Shipment

05 / 09Trusted By

Long-term supply to Japanese industry.

Three decades of manufacturing for Japanese customers in cooling towers, water treatment, sanitary equipment, and OEM supply.

Water Treatment
Active since2001

Tanks, vessels, and ducting for Japanese water and wastewater operators.

Environmental
Active since2005

Sanitary and environmental products through long-term OEM partnerships in Japan.

Cooling Tower
Active since2003

FRP cooling tower parts and components for Japanese OEMs and plant operators.

Steel Fabrication
Active since2000

Steel frames, flanges, and welded assemblies supplied with FRP products.

30+Years

of FRP manufacturing experience

OEMFocus

Custom build-to-order manufacturing

JapanMarket

Primary customer base

06 / 09Factory

Manufactured in China with quality management tailored to Japanese standards.

The lamination hall uses clearly organized production stations and a continuous-flow layout, supporting traceability and quality management. Quality processes aligned with Japanese customer requirements.

PROFIT DAY

China Manufacturing Base

Zhaoqing, Guangdong, China

Manufacturing Base — China

Production facility in China, managed to Japanese quality standards.

Steel fabrication bay
Steel FabricationBay 04
Assembly and inspection area
Assembly & InspectionBay 05
1996

Manufacturing since

20Steps

Managed FRP workflow

CN

Manufacturing location

HK

Headquarters

Manufacturing Location

Qianchuan Fiberglass Products Factory

No. 2 Jin Road, Jinli Town, Gaoyao District, Zhaoqing City, Guangdong Province, China

07 / 09Company History

Three Decades of Manufacturing Experience

Since 1995, PROFIT DAY has continuously provided OEM and custom FRP manufacturing solutions for Japanese industrial customers.

  1. PROFIT DAY Established

    PROFIT DAY was established in Hong Kong.

  2. Dong Fu Factory Began Production

    The Dong Fu factory began production in China, marking the start of FRP manufacturing.

  3. Metal Fabrication

    Metal fabrication capability added.

  4. Business Expansion

    Business expansion.

  5. Production Expansion

    Production capability expanded.

  6. Shimoda Ecotech Partnership

    Long-term partnership with Shimoda Ecotech.

  7. Scale Increase

    Production scale increased.

  8. Strategic Partnerships

    Partnerships with Fuji Clean and Tono Kasei.

  9. New Leadership

    New management leadership.

  10. China Domestic Purchasing & Sales

    The Dong Fu factory began purchasing and selling in China's domestic market.

  11. 30+ Years of Service

    Serving Japanese industrial customers for over 30 years while welcoming international project quote requests.

08 / 09Trusted By

A Long-Term Partner to Japanese Industrial Customers

For more than three decades, PROFIT DAY has supplied FRP and steel components to Japanese manufacturers in cooling towers, water treatment, sanitary equipment, and environmental products.

Selected long-term business partners.

  • Daie
  • Fuji Clean
  • Hamanetsu
  • Hitachi
  • Hitachi Chemical
  • Kuken
  • MOLYMER
  • Nissei
  • Shimoda Ecotech
  • Tono Kasei

Representative companies shown above are examples of long-term business partners. Company names and logos remain the property of their respective owners and are displayed solely to illustrate historical business relationships.

09 / 09Applications

Where PROFIT DAY products go to work.

Cooling towers, water-treatment equipment, sanitary and environmental systems, steel fabrication, and OEM supply — FRP and steel components manufactured to customer drawings.

Cooling Tower Systems
01 · Cooling Tower Systems

FRP cooling-tower casings, fan-opening sections, and integrated steel components manufactured to customer drawings for cooling-tower assemblies.

  • FRP Casings
  • Fan-Opening Sections
  • Integrated Assemblies
ContactStart a project

Send a drawing. Get a proposal.

Upload a drawing or specification. Our engineering team reviews every submission and will respond as soon as possible regarding materials, tooling, pricing and lead time.

Our engineering team will review your submission as soon as possible.0/5 valid
Contact by Email
Response time
Within 48 hours
Quote turnaround
After review
Languages
Japanese · English · Chinese
Sample Lead Time
2–4 weeks after mold confirmation
NDA available
Standard or customer
Quote review
Engineering team